Follo Line, Norway
The Follo Line project is currently the largest transport project in Norway.
The project consists of a new 22 km double-track railway line between Oslo and Ski, which is also a new high-speed railway line.
The city of Oslo has expanded rapidly in recent years and a new transport infrastructure is needed in response to this growth. This is especially so when it comes to strengthening the link between the capital city and the Norway's southern region.
The project will be using tunnelling machines combined with traditional drilling and blasting methods to overcome the greatest challenge faced by these works – the 18.5 km twin railway tunnel.
Each of the four tunnelling machines will bore a 10 m diameter tunnel, which will be simultaneously lined with a total of 140,000 concrete segmental lining rings.
When the project is complete at the end of 2021, it will take only 11 minutes for passengers to travel the 22 km between Oslo and Ski – thanks to this new railway line that will allow trains to travel at 250 km per hour.
This article was originally published here by ICE on 16 June 2017. It was written by Jon Ander.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.